DIN EN 61439: The key standard for low-voltage switchgear assemblies

As a manufacturer of switchgear with over 50 years of experience, we have compiled everything you need to know about DIN EN 61439 in control panel construction on this page—explained in an easy-to-understand way and organized with practical applications in mind.

  • ✓DIN EN 61439 Explained Simply
    The structure of the standards series, the black-box concept, and interfaces clearly organized
  • ✓Safety & Legal Compliance
    Document and verify design and unit verification in accordance with the standard
  • ✓Practical knowledge from 50 years of experience
    Directly from our switchgear experts

In switchgear manufacturing, the DIN EN 61439 (VDE 0660-600) series of standards serves as the central basis for low-voltage switchgear assemblies and defines their safety requirements up to 1,000 V AC or 1,500 V DC. An assembly of switchgear comprises not only the built-in switching devices, but also the enclosure, internal connections, terminals, and load-bearing structural components. The standard covers functions such as power distribution, control, measurement, protection, and regulation, thereby providing the technical framework for virtually every system in industrial switchgear construction.

For design engineers and procurement professionals in plant and machinery engineering, the standard provides the binding technical basis for the specification, ordering, and acceptance of switchgear. Since November 2014, it has completely replaced the former DIN EN 60439; the revised edition from October 2021 is currently in effect. The following sections of this page explain the structure of the standards series, the “black box” concept, the division of roles between manufacturers and operators, the required documentation, as well as technical requirements and their practical relevance in the ordering process.

Whether you’re planning a new installation, working with an existing system, or carrying out a retrofit: Knowing the requirements of the standards series early on helps you avoid incorrect specifications, unnecessary documentation, and delays in the ordering process. As a switchgear manufacturer with our own production facilities, we support you from the design phase based on the “black box” concept, through type and unit certification, to the standard-compliant documentation of your switchgear assembly—backed by over 50 years of experience in switchgear manufacturing.

Your contact persons

Dirk Schütz

Head of Switchgear Construction Department

T +49 2261 987-405
E-Mail | vCard

Felix Trommershausen

Sales Switchgear Construction

T +49 2261 987-413
E-Mail | Linkedin | vCard

Structure and Scope of the DIN EN 61439 Series of Standards

The structure of the DIN EN 61439 series of standards follows a two-tiered approach: Part 1, as the foundational standard, defines the general terms, testing principles, and verification procedures that apply to all switchgear assemblies. This framework is supplemented by the product-specific Parts 2 through 7, such as for power switchgear assemblies, installation distribution panels for non-professionals, construction site power distribution panels, public power distribution networks, rail distribution systems, or—with DIN EN IEC 61439-7 —for special applications such as marinas, campgrounds, and charging stations for electric vehicles. Important for practical application: Part 1 alone is not sufficient for a complete assessment of a switchgear assembly; the combination of the basic standard and the applicable product part is always decisive. The standard applies to both custom-made units and mass-produced products. In Germany, the parallel designations for this standard are DIN EN 61439, DIN EN IEC 61439, and VDE 0660-600. The technical report IEC TR 61439-0 serves as a supplementary document, providing guidance on the specification of switchgear assemblies.

Part 1 as a Basic Standard: General Specifications

The basic standard DIN EN IEC 61439-1 (VDE 0660-600-1) “General Specifications” defines terms, normal and special operating conditions, as well as the fundamental design and testing requirements that apply to the entire DIN EN 61439 series of standards. It specifies the rated values that unambiguously describe a switchgear assembly: these include rated voltage, rated current, rated operating current of a circuit, rated insulation voltage, rated frequency, and rated load factor. These parameters form a common technical language between designers, purchasers, and switchgear manufacturers and enable unambiguous specifications without room for interpretation. With the revised edition DIN EN IEC 61439-1:2021-10, the structure of the basic standard was revised; however, the requirements for the IPXXB protection rating—which were added at the same time—were not incorporated into Part 1 but rather into Part 2, where they apply only to compartments with a subdivision factor greater than 1, whose parts remain live even when the functional unit is switched off. In practice, the following remains crucial: Part 1 may not be cited as standalone proof of conformity, as it does not contain product-specific test procedures for individual pieces of equipment. An order or request for proposals that merely refers to the basic standard without specifying the applicable product part is therefore incomplete. In practice, comparing bids without standardized design values often leads to misinterpretations and the need for subsequent clarification among project participants.

Part 2: Power Switchgear Assembly (PSC)

The substandard DIN EN IEC 61439-2 (VDE 0660-600-2) describes power switchgear assemblies and supplements the basic standard with product-specific requirements for main and sub-distribution panels, motor control centers, and process switchgear in industrial, commercial, and similar applications. In addition to design and construction, Part 2 specifies the thermal analysis: For systems up to 630 A, it is sufficient to sum the power losses of all equipment, provided that the equipment is loaded to a maximum of 80% and the main current paths are rated for at least 125% of the rated current. In addition, the standard specifies requirements for the IP protection ratings of the enclosure—such as IP54 for dust-protected industrial environments or IP65 for systems with enhanced protection against water jets—as well as for the internal subdivision into design types and the operability of the functional units. For design engineers, Part 2 is the most frequently applicable product section in plant and mechanical engineering projects and should always be specified together with Part 1 in requests for proposals to ensure a complete normative reference.

Parts 3 through 7: Installation Distribution Panels and Other Applications

The product-specific parts 3 through 7 of the series of standards specify the basic standard for specific applications and serve as a guide for professional designers when selecting standard components. DIN EN 61439-3 applies to distribution panels that may also be operated by laypeople—that is, non-electrical specialists—such as in residential or office buildings. DIN EN 61439-4 governs temporary power distribution panels for use on construction sites, while DIN EN 61439-5 applies to switchgear assemblies in public power distribution networks, such as cable distribution cabinets. DIN EN 61439-6 covers busway systems for flexible power distribution across larger areas of a facility. Finally, Part 7 addresses specific applications such as marinas, campgrounds, marketplaces, and charging infrastructure for electric vehicles. Which part applies in a specific case depends on the installation location, the user group, and the function of the system. For example, a PV distribution system in a residential area may fall under Part 3, while charging infrastructure may be classified under Part 7, depending on its specific design.

Black-Box Concept and Interfaces to the Installation Environment

To facilitate communication between designers and manufacturers, the series of standards methodically employs the “black box” concept: The switchgear assembly is regarded as a closed unit whose characteristics are described exclusively through defined interfaces with the installation environment. Instead of evaluating individual internal components, the standard specifies where the system boundaries lie and which characteristic values must be met at these boundaries. This model clearly structures communication during the ordering process: The designer provides the boundary conditions of the installation environment, while the switchgear manufacturer, as the producer of the switchgear assembly, is responsible for the internal design and verifies compliance with the specified values. In total, the standard defines four interfaces between the switchgear assembly and its environment, which are discussed individually below. In practice, it is crucial to note that incomplete or missing interface specifications in the request for proposal or purchase order often lead to incorrect designs—for example, regarding thermal load or short-circuit withstand capacity—and thus require subsequent clarification between the designer and the switchgear manufacturer.

Power Connection and Installation Requirements

For the first interface—the grid connection—the type and configuration of the utility grid, the rated voltage and frequency, and the grounding and neutral conductor configuration must be specified; separate specifications apply to DC applications. Of central importance is the prospective short-circuit current at the installation site, from which parameters such as the uninfluenced short-circuit current Icp, the conditional rated short-circuit current Icc specified by the manufacturer of the switchgear assembly, the rated short-time withstand current Icw, and the rated breaking capacity Icu. Systems up to 10 kA, as well as current-limited devices up to 17 kA, are exempt from the testing requirement. The second aspect concerns installation and environmental conditions: indoor or outdoor installation, ambient temperature (including daily average), pollution degree, relative humidity, elevation above sea level, electromagnetic environment, as well as space requirements and accessibility. For example, protection class IP20 is often sufficient for dry indoor environments, while different conditions require higher protection classes. In the black-box concept, these specifications are considered normal operating conditions; any deviation must be expressly agreed upon, as it directly affects the thermal analysis, protection class, and device derating.

Electrical Circuits, Operation, and Maintenance

The third interface concerns the circuits and loads: This includes the number and type of outlets, the rated operating currents of the individual circuits, and the simultaneous use factor or rated load factor, which determines how many outlets can be operated simultaneously and with what load. Cable cross-sections and the direction in which the cables enter must also be specified, as these influence the internal layout of the functional units. In addition, there are selectivity requirements between upstream and downstream protective devices, as well as special requirements related to motor starts or harmonics, which can cause additional heating. The fourth interface governs operation and maintenance: The user group must be clarified—that is, whether qualified personnel or laypeople have access—as well as requirements for potential operation while the system is energized. Equally relevant is whether functional units can be expanded or replaced during operation, what internal compartmentalization is required for this, and how accessibility for maintenance work must be designed. This information regarding interfaces 3 and 4 significantly determines the design and thus the price of the system and should therefore be clarified early in the ordering process between the designer and the manufacturer.

Manufacturer roles: original manufacturer and manufacturer of the switchgear assembly

The DIN EN 61439 series of standards consistently distinguishes between two levels of responsibility in the development process of a switchgear assembly. The original manufacturer develops the underlying system, performs the type testing, and defines design rules, permissible configuration variants, and power dissipation limits; these fundamentals must be documented, and the supporting documentation must be retained for ten years. The manufacturer of the switchgear assembly —in practice, usually the switchgear manufacturer—selects the specific components within these specified limits, handles assembly, wiring, and labeling, prepares the associated documentation, and performs the unit verification for each manufactured system. If the actual design deviates from the original system—which is almost always the case with customer-specific solutions—the burden of proof lies with the switchgear manufacturer. Both roles may be performed by a single company, for example, when a manufacturer both develops the modular system and performs the final assembly. Regardless of this, the allocation of responsibility must always be documented in a traceable manner so that, in the event of a dispute or inspection, it can be clearly determined who is responsible for which documentation.

Responsibility for Renovations and Expansions

Even after a switchgear assembly has been completed, the issue of responsibility remains relevant as soon as retroactive modifications are made to existing systems. The replacement of components, the retrofitting of additional outputs, or the increase of rated values are permitted only within the limits specified by the existing type approval for the original system. If these limits are exceeded, the role of the original manufacturer may transfer to the company performing the modifications—with the result that the latter must provide its own certifications for the modified scope. For operators, this results in a clear course of action: First, the system’s existing documentation must be reviewed; then, the design rules of the original system provider must be followed. Every modification made must be documented, and the component-by-component verification must be repeated for the modified scope of the system. This principle applies regardless of the system’s size or the extent of the modification and applies to both individual component replacements and more extensive expansions of existing switchgear assemblies.

Responsibilities of Planners and Users

In the practical collaboration between the client and the switchgear manufacturer, the designer is responsible for clearly defining all interface data for the black-box model and formulating this data in the request for proposals in a verifiable manner—this includes the applicable standard, the rated values, the degree of protection, the internal compartmentalization, selectivity requirements, and environmental conditions. Only a request that is this specific will later enable a reliable comparison of bids from multiple manufacturers. In turn, upon delivery, the user or purchaser verifies that the relevant supporting documents are complete: the individual test report, the information on the nameplate and markings—such as the manufacturer’s name, type designation, rated voltage, rated frequency, rated current, and rated short-circuit current—confirmation of the type approval, and a complete operating and maintenance manual. A sample checklist can serve as a guide for what information a complete inquiry should typically include, such as the scope of delivery, installation site, required expansion capacity, and deadlines for factory acceptance and delivery. It is important to note that a CE marking in accordance with the Low-Voltage Directive 2014/35/EU does not replace the declaration of conformity according to the DIN EN 61439 series of standards, as it refers to the requirements of the directive and not to the product-specific test procedures of the standard. Operators are therefore advised to request both forms of proof separately and to document this in writing during the ordering process.

Design documentation and piece-by-piece documentation as evidence of conformity

The conformity of a switchgear assembly is demonstrated through two systematically distinct types of verification that cover different levels of testing. Type testing pertains to the design and construction of a system and must be performed once for each specific type; it confirms that the design principle and configuration meet the requirements of the standard. Unit verification, on the other hand, applies to each specific combination manufactured and is performed during production for every individual switchgear cabinet before it leaves the factory. This distinction applies regardless of batch size: Even in series production of identical models, individual testing remains mandatory for every manufactured combination. Three methods are recognized for the former type of verification: laboratory testing, often referred to as type testing; comparison with a previously tested reference design using checklists and design rules; and calculation-based determination. However, not every method is permissible for every characteristic—for example, the calculated heating analysis applies only up to 1600 A; above this limit, test verification is required. This has a clear implication for the ordering process: designers and purchasers should request both forms of verification separately, as neither replaces the other.

Contents and Documentation of the Design Verification

The design verification encompasses a wide range of technical characteristics, which, depending on their nature, can be substantiated through type testing, calculation, or comparison with a reference design. These include the strength of materials and components, the enclosure’s protection class, air and creepage distances, and protection against electric shock, including the continuity of the protective conductor system. The installation of equipment, internal circuits and connections, the terminals for incoming conductors, insulation properties, heating, short-circuit withstand capability, electromagnetic compatibility, and mechanical function are also tested. For enclosures that have already been tested in accordance with DIN EN 62208, this compliance may be credited toward the type approval required by DIN EN 61439, provided that no significant changes have been made; however, an additional separate test of the mechanical properties remains required. The original manufacturer provides all supporting documentation and retains it for ten years. The binding design rules, within which the switchgear manufacturer —as the manufacturer of the switchgear assembly—is permitted to select and assemble components, are derived from this documentation. This combination of testing, calculation, and reference comparison ensures a uniform level of safety that specialist planners can use as a reliable benchmark when evaluating manufacturer documentation.

Parts list for the completed system

The unit inspection is performed as either an in-process or final inspection on each individual switchgear assembly and marks the completion of manufacturing at the plant before the system is released for shipment. First, a visual inspection of the design, wiring, and labeling is conducted, during which compliance with the approved schematic is also verified. Next, the effective protective measures and the continuity of the protective conductor circuit are tested, followed by an insulation test or voltage test. The functional test of the installed equipment and interlocks ensures that protective devices will respond as intended during subsequent operation; finally, the associated documentation is checked for completeness. Unlike the type test specified in the design verification, which is performed once in a laboratory, this testing procedure is repeated for every manufactured combination. The result is a test report that is handed over to the client along with the nameplate and system documentation. It makes sense for purchasers to explicitly request the individual unit test report as an acceptance document and to verify its submission before payment or commissioning. It is important to note that a properly conducted unit inspection does not replace the type approval, as the two forms of certification cover different levels of testing—the design on the one hand, and the actual implementation on the other.

Technical Requirements and Design Values

In addition to heating and short-circuit resistance, the technical requirements of the DIN EN 61439 series of standards also include insulation coordination, protection against electric shock, degree of protection, internal compartmentalization, pollution degree, and natural and active cooling. Each of these characteristics is described using defined design values and must be verified using one of the recognized methods of verification—testing, calculation, or comparison with a reference design. For example, depending on the voltage, insulation coordination requires maintaining a range of 3 to 12.5 mm for clearances and creepage distances, while the heating verification for natural cooling requires combined verification methods for currents exceeding 1,600 A. The 2021-10 revision also clarified requirements for direct current applications, active cooling, and thermal verification; new annexes for photovoltaic applications were also added. In Part 2, a minimum protection rating of IPXXB was also added as a requirement for compartments with a subdivision form greater than 1, whose parts remain live even when the functional unit is switched off. For design engineers, this means it is necessary to clearly specify these characteristics in the request for proposals, as they directly determine the design, construction, and ultimately the price of the switchgear assembly.

Heat Generation Verification and Current Carrying Capacity

In practice, the thermal analysis is considered the most time-consuming part of the type approval process, as it directly links the permissible internal temperature of the switchgear assembly to the protection of insulation properties and equipment. For systems up to 630 A, it is sufficient to sum the power losses of all installed components, while for systems up to 1,600 A, a recognized calculation method is permitted; above this limit, the only options are generally a thermal analysis or a comparison with a previously tested reference design. In the design, a safety margin is applied such that built-in devices may be loaded to a maximum of 80 percent in the verification, while main current paths must be designed for at least 125 percent of the rated current. For current-carrying conductors of approximately 200 A or higher, additional design measures to minimize eddy current losses become relevant, as these further influence heating. The ambient temperature at the installation site and the agreed-upon load factor are directly incorporated into the verification as boundary conditions and determine whether the calculated current-carrying capacity is actually maintained during operation.

Short-Circuit Resistance: Icp, Icc, Icw, and Icu

The short-circuit withstand capability of a switchgear assembly is always determined by the interaction between the assembly and the upstream protective device and cannot be assessed in isolation based on the assembly itself. The starting point is the prospective short-circuit current Icp at the installation site, which is compared with the conditional rated short-circuit current Icc specified by the manufacturer and the rated short-time withstand current Icw of the assembly; in addition, the rated breaking capacity ( Icu ) of the upstream protective device determines which short-circuit current can be safely interrupted. For the corresponding verification, the standard recognizes three methods: laboratory testing, comparison with a previously tested reference design using a checklist, and calculation. Systems with a rated short-circuit current of up to 10 kA, as well as combinations with current-limiting devices up to 17 kA, are exempt from the testing requirement. For professional designers, specifying the prospective short-circuit current at the installation site as an interface value remains essential, since without this value neither Icc nor Icw can be meaningfully determined, and evaluating protection coordination during the ordering process is virtually impossible.

Insulation Coordination, Protection Rating, and Electromagnetic Compatibility

With regard to insulation properties, the design verification specifies the rated insulation voltage, rated surge withstand voltage, and pollution degree, from which the required clearance and creepage distances are derived; these typically range from 3 to 12.5 mm, depending on the voltage and pollution degree. With regard to the degree of protection, the IP code according to DIN EN 60529 specifies protection against foreign objects and water depending on the installation location and user group; it must be distinguished from electrical protection class I or II, which refers to protection against dangerous contact voltage inside the enclosure. For compartments with a subdivision form greater than 1, whose parts remain live even when the functional unit is switched off, Part 2 specifies that at least IPXXB applies as the minimum degree of protection against access to hazardous parts. Ventilation openings for natural cooling have a direct impact on the achievable protection class and must be balanced against thermal management requirements. With regard to electromagnetic compatibility, the system must be classified according to its environment—industrial or residential—in accordance with the immunity and emission requirements of the DIN EN 61000-6 series of standards. In cabinet design, continuous shielding, separate routing of power and control circuits, and a low-impedance equipotential bonding ensure compliance with these requirements.

Differences from the Previous Standard, DIN EN 60439

Before DIN EN 61439 was introduced, the predecessor standard, DIN EN 60439, regulated the construction of low-voltage switchgear assemblies according to a fundamentally different principle: Systems were classified into the categories TSK (type-tested switchgear assembly) and PTSK (partially type-tested switchgear assembly) based on type testing. Since November 2014, this classification has been completely phased out, as DIN EN 61439 definitively replaced DIN EN 60439 at that time. The rigid categories were replaced by the verification concept currently in effect, consisting of design and unit verification, combined with a clear distinction between the original manufacturer and the manufacturer of the switchgear assembly. There has also been a development within the new standard: The 2012 edition was followed by the revised 2021-10 version, which included structural adjustments. In practice, the designations DIN EN 61439, DIN EN IEC 61439, and IEC 61439 are also commonly used, all of which refer to the same technical content. When comparing with existing documentation and older contracts, it remains important to note that terms such as TSK or PTSK still appear in those documents and must be interpreted in light of current verification standards during the assessment.

Elimination of TSK and PTSK

In practice, the distinction between TSK and PTSK often proved to be a source of uncertainty, since the line between fully type-tested and only partially tested assemblies was not always clear, and designers and operators could hardly determine the actual scope of verification for a system designated as PTSK. Particularly in the case of custom-assembled switchgear combinations, it remained unclear which components were covered by type testing and which were supplemented only by calculations or manufacturer specifications. Today’s verification concept resolves this ambiguity by placing testing, comparison with a reference design, and calculation on an equal footing as clearly defined verification methods, among which a choice can be made depending on the characteristic, without this implying a reduced level of verification. For design engineers and procurement professionals, this provides a practical guideline: If the terms TSK or PTSK still appear in current bids, data sheets, or contract documents, this indicates an outdated version of the standard and should be explicitly questioned during the ordering process.

Common Misconceptions About the Status of Standards

In day-to-day project work, certain misjudgments regarding the status of standards tend to recur; these can be clarified by asking manufacturers specific questions. It is often assumed that a CE marking renders product-specific documentation unnecessary, even though the two documents serve different purposes. Equally common is the assumption that a reference to the base standard alone is sufficient as a basis for conformity, without specifying the relevant product section. The notion that individually certified components automatically result in a tested combination also contradicts the fundamental principle of the standard, according to which the entire system must always be evaluated. Furthermore, an individual unit test is occasionally mistakenly equated with the more comprehensive type approval. Another critical issue is the retroactive installation of arbitrary components without a new evaluation by the manufacturer of the switchgear assembly. Last but not least, the term “TSK” appears in older documents and is mistakenly equated with today’s type approval. By specifically questioning such claims with planners and purchasers, one can determine early on whether the manufacturer’s specifications are actually reliable.

Practical Relevance for Procurement and Operations

In terms of procurement, this series of standards specifically requires that inquiries and requests for proposals clearly specify the applicable standard section, complete interface data, required design values, protection class, internal configuration, and scope of documentation. This is the only way to prevent suppliers from making different assumptions regarding thermal runaway verification or short-circuit resistance. Upon acceptance, the user should have the complete individual test report, marking and nameplate, confirmation of the type approval, circuit diagrams, and operating and maintenance instructions before the system is put into service. These documents also form the basis for future expansions: Without knowledge of the original design rules, it is impossible to assess whether a modification is permissible within the scope of the existing type approval or requires separate verification. The information on the nameplate and the circuit diagrams also serve as a reliable reference for maintenance and periodic inspections, such as those required by DGUV Regulation 3. This transforms the normative requirement into a practical tool for the entire service life of the switchgear assembly.

Additional Standards in Control Cabinet Construction

This page is part of our series on standards. For a complete overview, see the page on control panel construction standards; for details on the other standards:

Do you need a control cabinet manufactured in accordance with standards? Unitechnik is your partner for control cabinet and switchgear construction —UL-certified for over 50 years.

Specifications and Request for Proposals by the Designer

A structured checklist helps in preparing a request for proposals that covers all the relevant requirements for the switchgear manufacturer—it is explicitly intended as a template that should be adapted to each specific project. These include the applicable standard section along with the standard version, power supply type, and prospective short-circuit current at the installation site, as well as the rated values of the system and the individual circuits and the agreed-upon load factor. In addition, environmental conditions, installation type, required protection rating and protection class, as well as the internal layout, must be specified. A complete request for proposal should also include requirements for operation during normal service, planned reserve space for future expansions, and specifications regarding labeling, documentation, and required supporting documentation. Such a verifiable specification prevents subsequent back-and-forth clarifications and makes incoming quotes comparable with one another, since the manufacturer can calculate exclusively within the constraints defined by the planner. If any of this information is missing, the supplier must make its own assumptions—with the risk that subsequent amendments or discrepancies may arise during delivery and acceptance.

Acceptance, Documentation, and the Operator's Responsibilities

When taking delivery of a switchgear assembly, the operator first checks whether the documentation provided by the switchgear manufacturer is complete, including the wiring diagrams, individual test reports, and operating instructions. The information on the nameplate must be compared with the original specifications to identify any discrepancies in the rated values at an early stage. The individual test report serves as proof that the specific system was successfully tested prior to delivery; it must be archived along with the other supporting documents, as subsequent changes can hardly be evaluated without these documents. Furthermore, an initial inspection in accordance with DGUV Regulation 3 in conjunction with DIN VDE 0100-600 must be performed prior to the first commissioning; the system operator is subsequently responsible for ensuring that this inspection is repeated at regular intervals. During ongoing operation, the operator remains obligated to comply with the operating and environmental conditions as well as the load limits specified by the manufacturer, to adhere to maintenance intervals, and to ensure accessibility to the functional units. Periodic inspections must be performed by a qualified electrician in accordance with TRBS 1203 and are legally required under the Industrial Safety Regulation. Any retrofits or expansions must always be documented. Conformity with the DIN EN 61439 series of standards is maintained only as long as operation and modifications remain within the verified limits.

Your contact persons

Dirk Schütz

Head of Switchgear Construction Department

T +49 2261 987-405
E-Mail | vCard

Felix Trommershausen

Sales Switchgear Construction

T +49 2261 987-413
E-Mail | Linkedin | vCard

FAQ

Why was the black-box concept introduced with DIN EN 61439?

The “black box” concept was introduced to simplify communication between designers and switchgear manufacturers and to prevent misunderstandings when evaluating custom-configured switchgear assemblies. Instead of evaluating every single internal component—which would be virtually impractical for customer-specific systems—the standard treats the switchgear assembly as a single unit and specifies the performance characteristics that must be met at the interfaces with the installation environment. Prior to the introduction of this concept, there was no uniform system for clearly assigning responsibilities among the parties involved. The concept therefore establishes a clear, verifiable basis for ordering and acceptance, which prevents disputes over responsibilities.

Which four interfaces to the installation environment does the black-box concept define?

The black-box concept defines four interfaces between the switchgear assembly and its installation environment, through which all relevant characteristics of the system are described:

  • Grid connection: Type and configuration of the power supply, rated voltage and frequency, grounding concept, and the expected short-circuit current at the installation site.
  • Installation and environmental conditions: indoor or outdoor installation, ambient temperature, pollution level, relative humidity, elevation above sea level, and electromagnetic environment.
  • Circuits and Loads: Number and type of branch circuits, rated operating currents, load factor, cable cross-sections, and selectivity requirements.
  • Operation and Maintenance: User group, requirements for live-line operation, expandability during operation, and accessibility for maintenance.

 

What is the "black-box concept" in DIN EN 61439?

The black-box concept treats the switchgear assembly as a self-contained unit whose characteristics are described exclusively through defined interfaces with the installation environment, rather than by evaluating individual internal components. The standard specifies where the system boundaries lie and which parameters must be met at those boundaries. This model clearly structures the ordering process: The designer provides the boundary conditions of the installation environment, while the manufacturer of the switchgear assembly is responsible for the internal design and verifies compliance with the specified values.

In total, the standard defines four such interfaces between the switchgear assembly and its environment. In practice, incomplete information regarding these interfaces often leads to incorrect design, for example, regarding thermal load or short-circuit withstand capability.

Which switchgear assemblies are covered by DIN EN 61439-2?

DIN EN IEC 61439-2 describes power switchgear assemblies and supplements the basic standard with product-specific requirements for industrial, commercial, and similar applications. Specifically, it covers:

  • Main and sub-distribution panels
  • Motor control centers
  • Process switchgear

 

What distinguishes Part 1 of DIN EN 61439 from the product-specific Parts 2 through 7?

Part 1 (DIN EN IEC 61439-1) is the basic standard and defines general terms, normal and special operating conditions, rated values, and fundamental design and testing requirements that apply to the entire series of standards. However, it does not contain any product-specific test methods and therefore may not be used as a standalone proof of conformity. Parts 2 through 7 specify this framework for specific applications, such as power switchgear assemblies, installation distribution panels for non-professionals, construction site power distribution panels, public power distribution networks, busbar distribution systems, or special applications. Without the appropriate product part, the assessment based on the basic standard remains incomplete, as product-specific test steps and design features are missing.

How is the DIN EN 61439 series of standards structured?

The DIN EN 61439 series of standards follows a two-part structure. Part 1, as the basic standard, sets forth the general requirements—that is, definitions, testing principles, and verification procedures—that apply to all switchgear assemblies. This framework is supplemented by the product-specific Parts 2 through 7, covering, for example, power switchgear assemblies, installation distribution panels for non-professionals, construction site power distribution panels, public power distribution networks, busbar distribution systems, and special applications such as marinas, campgrounds, and charging stations for electric vehicles. Part 1 alone is not sufficient for a complete assessment; the combination of the basic standard and the applicable product part is always decisive. The standard applies to both custom-made products and mass-produced items. In Germany, the parallel designations for this standard are DIN EN 61439, DIN EN IEC 61439, and VDE 0660-600.

What does DIN EN 61439 cover, and to which products does it apply?

DIN EN 61439 is the primary series of standards for low-voltage switchgear assemblies in control panel construction and specifies their safety requirements up to 1,000 V AC or 1,500 V DC. A switchgear assembly includes not only the built-in switchgear components but also the enclosure, internal connections, terminals, and load-bearing structural parts.

It regulates functions such as:

  • Power distribution
  • Control
  • Measurement
  • Protection
  • Regulation

It thus provides the technical framework for virtually every system in industrial control panel construction and serves as a binding reference for design engineers and purchasers when specifying, ordering, and accepting switchgear.

Can an existing switchgear assembly in accordance with DIN EN 60439 still be used?

An existing switchgear assembly that was manufactured and commissioned in accordance with DIN EN 60439 may, in principle, continue to be operated. This grandfather clause applies to the condition in which the equipment was originally accepted, as long as its operation and load remain within the limits verified at that time.

However, please note:

  • Subsequent modifications, expansions, or component replacements must comply with the original design specifications.
  • If these guidelines are not followed, liability may transfer from the original manufacturer to the company performing the modifications, which must then provide its own verification.
  • For the modified scope, the individual verification must be repeated.
  • Designations such as TSK or PTSK from the existing documentation must be translated into the current verification logic according to DIN EN 61439 when changes are made.

What did the elimination of the TSK and PTSK categories mean for control panel manufacturing?

Prior to the introduction of DIN EN 61439, switchgear assemblies were classified according to DIN EN 60439 into TSK (type-tested switchgear assemblies) and PTSK (partially type-tested switchgear assemblies). This classification proved to be vague, as it was often unclear to designers and operators which components were actually type-tested and which were covered only by calculations or manufacturer specifications. With the elimination of these categories, the current verification concept took their place:

  • Design verification for the construction
  • Unit verification for each manufactured system
  • Equivalent verification methods through testing, calculation, or comparison with a reference design

If the terms TSK or PTSK still appear in documents, this indicates an outdated version of the standard and should be questioned.

Why was DIN EN 60439 replaced by DIN EN 61439?

DIN EN 60439 was superseded by DIN EN 61439, which completely replaced its previous testing and classification principles. The previous standard classified switchgear assemblies into the categories TSK (type-tested switchgear assembly) and PTSK (partially type-tested switchgear assembly) based on type testing. This classification has been discontinued since November 2014, as DIN EN 61439 definitively replaced DIN EN 60439 at that time. The rigid categories were replaced by the verification concept currently in effect, which consists of design and unit verification, combined with a clear distinction between the original manufacturer and the manufacturer of the switchgear assembly.

What verification procedures does DIN EN 61439 specify for type verification?

For type verification, DIN EN 61439 recognizes three equivalent methods: laboratory testing (often referred to as type testing), comparison with a previously tested reference design using checklists and design rules, and calculation-based verification.

  • Type Testing (Laboratory Testing)
  • Comparison with a Tested Reference Design
  • Calculational determination

 

What is meant by "itemization" according to DIN EN 61439?

A piece-by-piece verification is performed for each individual switchgear assembly manufactured and completes the manufacturing process at the plant before the system is shipped. It includes the following test steps:

  • Visual inspection of the design, wiring, and labeling, as well as verification against the approved schematic diagram
  • Testing of protective measures and continuity of the protective conductor circuit
  • Insulation and voltage testing
  • Functional testing of the installed equipment and interlocks
  • Verification of the completeness of the accompanying documentation

Unlike the type approval, which confirms the design once, the unit approval is repeated for every manufactured combination—regardless of the lot size. The result is a test report that is handed over to the client along with the nameplate and system documentation and should be reviewed as an acceptance document prior to payment or commissioning.

What is meant by the design certification according to DIN EN 61439?

The type approval pertains to the design and construction of a system and is provided once for each specific type. It confirms that the design principle and configuration meet the requirements of the standard and is issued by the original manufacturer. Acceptable verification methods include laboratory testing, comparison with a previously tested reference design, and computational analysis; however, not every method is permissible depending on the characteristic—for example, computational heating analysis is only permitted up to 1,600 A; above this limit, test verification is required. For systems up to 630 A, the heat generation verification may be performed by summing the power losses of all equipment, provided that the equipment is loaded to no more than 80% of its capacity and the main current paths are rated for at least 125% of the rated current. The type verification includes, among other things:

  • Strength of materials and components, as well as protection class
  • Clearances and creepage distances, protection against electric shock
  • Temperature rise and short-circuit withstand capability
  • Electromagnetic compatibility and mechanical function

Who is considered the “manufacturer of the switchgear assembly” according to DIN EN 61439?

The manufacturer of the switchgear assembly is considered to be the party—in practice, usually the switchgear manufacturer—who selects the specific components and assembles the system within the design rules and limits specified by the original manufacturer. Their responsibilities include:

  • Assembly and wiring of the switchgear assembly
  • Labeling and preparing the accompanying documentation
  • Preparing a bill of materials for each manufactured system

 

Who is considered the “original manufacturer” under DIN EN 61439?

According to DIN EN 61439, the original manufacturer is defined as the party that developed the underlying system. This manufacturer conducts the type tests and specifies the binding design rules, permissible configuration options, and power loss limits. These fundamentals must be documented, and the verification documentation must be retained for ten years. The original manufacturer may be the same as the switchgear manufacturer, but this is not required. Within the limits specified by the original manufacturer, the manufacturer of the switchgear assembly may select and install components. If a design deviates from this original system, the responsibility—and thus the obligation to provide verification—may be transferred to the company performing the modification.